OVERVIEW:
We successfully completed a comprehensive utility and topographical survey at the Stockton Cycle Path. The primary objective was to accurately identify all existing surface features and subsurface utilities within the defined survey area.
Our dedicated teams carried out the work during night shifts to minimize disruption, ensuring all relevant features were thoroughly captured. These included:
Carriageway channel lines and crown lines
Boundaries of verges, fences, hedges, walls, embankments, mounds, and landscaped areas
Edges of footways and hard paved areas
Changes in surface materials
Traffic signs and bollards
Kerbs
Lighting columns
Additionally, we recorded manhole cover levels, invert levels, and identified utility types present within the area.
The detailed data gathered from this survey will support our client in developing plans for a new traffic signal upgrade, ensuring that design decisions are well-informed and aligned with existing site conditions.
Leeds
Doncaster
Sheffield
Bradford
Hull
Halifax
Sunderland
Newcastle
Middlesborough
Yorkshire Moors
Teesside
Cumbria
Harrogate
Teesdale
York
Yorkshire Dales
Goole
Carlisle
Keswick
Kendal
Barrow-in-Furness
Lancaster
Blackpool
Morecambe
Southport
Liverpool
Wigan
Manchester
Blackburn
Burnley
Forest of Bowland
Oldham
Chester
Stockport
Peak District
Skipton
Crewe
Rotherham
Stoke
Driffield

