News Snippets:
Water channel

Another day another water channel. The purpose of our visit is to survey the culvert and bridge to determine the overall condition and stability of the structures.
The laser scan results will produce a 3D model of the structures, this is the first step in the deformation monitoring and we will return to complete additional scans in approx 3-6 months or following a major storm when further erosion is likely to have occurred.

Share the snippet

take a look

More Snippets