There may not be any scheduled flights at Newcastle International Airport during the night but that doesn’t mean the airport goes to sleep, in fact the runways are almost as busy throughout the night as they are during the day. The nightshift starts and the race is on to complete the scheduled maintenance in order for the runways to be ready for the next days first arrivals and departures.
A team of over 100 operatives with heavy plant machinery dig up, level resurface and paint metres of runway in a night in order for it to be ready to use again at 6am.
Our surveyors are performing essential tasks such as setting out and surfacing checks and following up with accurate asbuilt surveys.
Tri-Tech have been pivotal in the rehabilitation works of Newcastle International Airport and our commitment to deliver high quality results on such a large scale scheme are second to none.
Leeds
Doncaster
Sheffield
Bradford
Hull
Halifax
Sunderland
Newcastle
Middlesborough
Yorkshire Moors
Teesside
Cumbria
Harrogate
Teesdale
York
Yorkshire Dales
Goole
Carlisle
Keswick
Kendal
Barrow-in-Furness
Lancaster
Blackpool
Morecambe
Southport
Liverpool
Wigan
Manchester
Blackburn
Burnley
Forest of Bowland
Oldham
Chester
Stockport
Peak District
Skipton
Crewe
Rotherham
Stoke
Driffield